PAST PROJECTS

Our Works

Our Design Portfolio

Turnkey Modular & BatteryBanQ Joint Venture: Powering the Future

The collaboration between Turnkey Modular and BatteryBanQ marks a groundbreaking step in the energy revolution. This joint venture brings together the expertise of Turnkey Modular in innovative modular solutions and BatteryBanQ’s leadership in energy storage technology. Together, we are committed to driving local innovation, delivering cutting-edge, sustainable energy solutions tailored to the unique needs of communities and businesses. As pioneers at the forefront of the energy transition, we provide reliable, scalable, and eco-friendly power solutions, empowering a cleaner and more sustainable future for all.

SISHEN MINE

Sishen Mine with Turnkey have designed and built a complete 1800m3/h pump station along with pipe manifolds tested and commissioned off-site.

Larger structures can be created on site by using our modular solution. Each module leaves our premises fully integrated and tested, each module is seamlessly integrated to the other modules on-site.

AMS/Tronnox, the ROM Booster Substation at Fairbreeze Mine, Mtunzini, KZN.
Day 1

AMS/Tronnox, the ROM Booster Substation at Fairbreeze Mine, Mtunzini, KZN.

Day 2

AMS/Tronnox, the ROM Booster Substation at Fairbreeze Mine, Mtunzini, KZN.
Day 2

AMS/Tronnox, the ROM Booster Substation at Fairbreeze Mine, Mtunzini, KZN.

Day 3

Greenside Colliery – 7,5m x 28.0m MV/LV Control Sub-Station

Balance of Plant successfully installed on Turnkey’s Modular’s Perma Shuttering system at a smelter in Rustenburg

Turnkey Modulars Perma Shuttering System

7,5m MVA 3CR12 Skid for Panama, South America

Turnkey Modular 128T Hydraulic Lifting System for United States of America

11KV MV Sub-Station for a remote mine in Botswana

11KV/1KV Outdoor Skid for a remote mine in Botswana

33KV GIS MV Sub-Station at Grootegeluk Mine in Lephalale, South Africa

Inside view of, 33KV GIS MV Sub-Station at Grootegeluk Mine in Lephalale, South Africa. Completely installed at Turnkey Modular’s workshop

86T MV/LV/Control Sub-Station fully assembled and tested prior to dispatch to Secunda

Inside view of - 86T MV/LV/Control Sub-Station fully populated at Turnkey Modular’s workshop

86T MV/LV/Control Sub-Station loaded for transport to Secunda

86T MV/LV/Control Sub-Station on-site in Secunda

10MVA Skid, completed for Schneider SA to be utilized in Panama

10MVA Skid, completed for Schneider SA to be utilized in Panama

10MVA Skid, completed for Schneider SA to be utilized in Panama

10MVA Skid, completed for Schneider SA to be utilized in Panama

AMS - Day 1 - Delivery to site

AMS - Day 1 - Delivery to site

MV and LV Substation. Housing
3 x 1,1MW VSD’s, Medium Voltage Switchgear, 2 x Battery Tripping Units, 3 x UPS’s, LV Switchgear and 3 x PLC’s. Fully functional and ready to be Energised.
Delivered on-site (Royal Bafokeng).

MV and LV Substation. Housing
3 x 1,1MW VSD’s, Medium Voltage Switchgear, 2 x Battery Tripping Units, 3 x UPS’s, LV Switchgear and 3 x PLC’s. Fully functional and ready to be Energised.
Delivered on-site (Royal Bafokeng).

MV and LV Substation. Housing
3 x 1,1MW VSD’s, Medium Voltage Switchgear, 2 x Battery Tripping Units, 3 x UPS’s, LV Switchgear and 3 x PLC’s. Fully functional and ready to be Energised.
Delivered on-site (Royal Bafokeng).

MV and LV Substation. Housing
3 x 1,1MW VSD’s, Medium Voltage Switchgear, 2 x Battery Tripping Units, 3 x UPS’s, LV Switchgear and 3 x PLC’s. Fully functional and ready to be Energised.
Delivered on-site (Royal Bafokeng).

MV and LV Substation. Housing
3 x 1,1MW VSD’s, Medium Voltage Switchgear, 2 x Battery Tripping Units, 3 x UPS’s, LV Switchgear and 3 x PLC’s. Fully functional and ready to be Energised.
Delivered on-site (Royal Bafokeng).

MV and LV Substation. Housing
3 x 1,1MW VSD’s, Medium Voltage Switchgear, 2 x Battery Tripping Units, 3 x UPS’s, LV Switchgear and 3 x PLC’s. Fully functional and ready to be Energised.
Delivered on-site (Royal Bafokeng).

AMS - Day 2 - Hydraulic lifting, placingon site - Day 2

AMS - Day 3 - Fully installed on site